Hydric Garfer Açude Viseu

Hydric Garfer Açude Viseu

Fornelo, Vila do Conde 41°21’2.13″N; 8°38’39.76″W

Revolution Slider Error: The param Slider Width should not be empty.

Rio Ave

The mini hydric from Açude Viseu has been producing since 2009.
It has an installed capacity of 0.39 MW.
Allows the supply of 489 families.

1.08 GWh

Annual Gross Production for 2022

400 ton CO2

Avoided emissions