Hydric Garfer Açude Viseu
Fornelo, Vila do Conde 41°21’2.13″N; 8°38’39.76″W
Rio Ave
The mini hydric from Açude Viseu has been producing since 2009.
It has an installed capacity of 0.39 MW.
Allows the supply of 489 families.
1.08 GWh
Annual Gross Production for 2022
400 ton CO2
Avoided emissions